Intumescent Coatings in London

Fire protection to structural steel for main contractors, fit-out contractors and developers. Specified to your fire strategy, finished to the standard your client expects, and recorded for handover.

30 to 120 min

Fire ratings, set by your fire strategy

One contractor

Protection and finish together

Out of hours

Planned with your programme

DFT records

With a full O&M handover pack

Why project teams choose Vivid

Structural steel protected, finished and handed over

One accountable contractor

Protection and finish, together

Planned around your programme

Evidence your client can rely on

The standard we bring

Recent projects, delivered for fit-out and construction clients

Intumescent protection is one part of a finishing package. These are recent Vivid projects: decorating and spraying packages that show how we work with fit-out and construction teams, and the standard of finish we bring to every job.

A fast-track decoration overhaul of reception, the Orangery, brasserie and auditorium, delivered in six months with a swift turnaround.

A 15-month refurbishment of common areas and event spaces, phased around the hotel’s ongoing operations to minimise guest disruption.

A long-running programme of decoration and service spraying.

A full decoration overhaul across three buildings, with distinct orange sprays to the spiral staircases that strengthen the brand’s identity.

Decoration to walls, ceilings and woodwork across four levels, with wallpaper to the ground floor corridor.

Where Vivid is different

Exposed steel, protected and finished

Where steel is on show, the coating is part of the design. We plan the protection and the visible finish together, because the topcoat has to be approved for the system and must not stop the coating expanding in a fire.

A typical system: primer, intumescent basecoat, then a sealer or topcoat.

Where we work

Built for projects where standards are high

We work as a specialist subcontractor for main contractors, fit-out contractors and developers on larger commercial projects in London and inside the M25.

Cat A and Cat B office fit-out

Existing steel exposed by strip-out, and steel that stays visible in the finished space.

Large refurbishments and multi-floor buildings

Floor-by-floor programmes, sequenced with the trades that follow. Penetrations through protected steel and walls are sealed as part of our fire stopping package.

Occupied buildings, out of hours

Spraying planned around tenants, with containment and extraction, as at Senator House.

Beams with web openings

For cellular beams the coating must be a product tested and assessed for that beam type. The manufacturer calculates the thickness for each beam, and we apply to that schedule.

Ratings and systems

The rating your fire strategy sets

“

Exposed steel should look as good as the building around it: protected, finished and recorded.

The rating comes from the building’s fire strategy and Building Regulations guidance, not from us. We work to the rating, system and thickness schedule that the design team and the coating manufacturer set.

30

minutes

60

minutes

90

minutes, delivered at Senator House

120

minutes, some products

Thin film coatings are mainly used where the requirement is 30, 60 or 90 minutes, and some products now reach 120 minutes. We have experience working with Sherwin-Williams, Nullifire and Jotun systems. The coating system and loading are set by the manufacturer, based on the steel section sizes and the rating required.

Plain speaking

How we deliver an intumescent package

We buy and manage

Application

Finish planned with the protection

How we work

How an intumescent package runs

01

Review and price
Send the steel schedule and fire strategy. We confirm the system, rating and thickness schedule for each element and price from them.

02

Survey and programme
Steel condition, existing coatings, access, containment and out-of-hours working agreed with the main contractor.

03

Apply, measure, correct
Specialist labour applies to the specified thickness. Dry film thickness is measured and recorded against the manufacturer’s schedule, and areas that fall short are corrected.

04

Seal, finish, hand over
A sealer or topcoat where specified, then the O&M and handover package.

Have a steel schedule? Send it and we will price from it.

Proof

Fire protection delivered in a live building

Senator House, Victoria

Fire protection work by Vivid Finishes on a commercial project

Fire protection work by Vivid Finishes

Fire protection project by Vivid Finishes, view 1
Fire protection project by Vivid Finishes, view 2

Compliance, handled

Thickness you can prove, and the right paperwork

Measured, not assumed

Thickness decides the fire rating, so it is measured. Dry film thickness is recorded against the manufacturer’s thickness schedule for each steel element, set from tested data for the section, the rating and the steel’s limiting temperature. Areas that fall short are corrected, and the records go in the O&M and handover package.

Regulation 38 of the Building Regulations requires fire safety information to be passed to the responsible person when work completes. Technical background: the Steel Construction Institute guide to fire protecting structural steelwork.

Competence and certification

Third-party certification requirements differ by project and package. If your specification asks for a particular scheme for coatings application, tell us at the start and we will confirm what we can provide for that package before you commit.

Straight answers

Intumescent coating questions answered

An intumescent coating, often called intumescent paint, is a thin fire protection applied to structural steel. It stays inert until a fire heats it to around 200 to 250°C, then swells into an insulating char layer. That layer slows the rise in steel temperature so the structure keeps its strength for the rated time.

Thin film intumescent coatings are mainly used for 30, 60 and 90 minute requirements, and some products now reach 120 minutes. The rating that applies comes from the building’s fire strategy. We work to the rating, system and thickness schedule that the design team and the coating manufacturer set.

It depends on the steel. The manufacturer’s tested data gives the dry film thickness for each section, based on its section factor (heated perimeter divided by cross-sectional area), the rating required and the steel’s limiting temperature. Slender sections need more coating than heavy ones. Thickness runs from a fraction of a millimetre to a few millimetres.

Yes, with a topcoat the manufacturer approves for that system. Some systems need no topcoat in a dry, controlled internal environment, and the data sheet says which. Exact colour matches with standard paint can be difficult, so agree the finish and a sample area early. Our spraying and decorating business plans the finish with the protection.

We buy the coating, manage the package and arrange the application, which is carried out by specialist subcontract labour. We say this plainly so you know who is on site and who is responsible for the work. Our spraying and decorating business plans the finish with the protection.

Yes. At Senator House in Victoria, the building still had tenants, so we carried out the spraying out of hours and installed local exhaust ventilation through removed windows. We plan access, containment and programme with the main contractor before work starts.

Yes. We work as a specialist subcontractor for main contractors, fit-out contractors and developers on larger commercial projects, including Cat A and Cat B office fit-out and refurbishment. Tell us the size, location and programme and we will confirm availability.

Send us the steel schedule or drawings (member sizes, lengths and quantities), the fire rating for each element, whether the steel is blasted, primed or already coated, whether it will be exposed or concealed, the site location and access, and your programme. Our lines are open 9 to 5, Monday to Friday.

It depends on the project, so we price from your steel schedule. The main factors are the rating, the section factors and quantity of steel, the number of coats, whether a finish is specified, access and out-of-hours working. Higher ratings and slender sections need more material and more coats, so they cost more.

Discuss your project

Send us your steel schedule

Vivid Finishes
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.