Vivid Finishes delivers passive fire protection and commercial decorating for main contractors, fit-out contractors and developers in Victoria and Westminster, and has been finishing London's commercial buildings since 2008. Our work here ranges from Senator House and 111 Buckingham Palace Road to Richmond House, Huckletree Westminster and the Taj Hotel.
At Senator House we worked out of hours in an occupied building, with Jotun intumescent coating to the columns for 90 minutes' fire resistance. If your Victoria project has live tenants and a fixed fire strategy, that is the kind of job we are set up for.
Victoria's office stock is refurbished while tenants stay in occupation, so fire protection and finishes have to run together. These are the services we provide for Victoria and Westminster project teams.
We buy the coating, manage the package and arrange the application, with ratings of 30, 60 or 120 minutes set by the fire strategy. DFT records come back in your handover pack. See intumescent coatings.
Sealing penetrations and cavities to maintain compartmentation. See fire stopping and fire barrier installation.
FireFly and Envirograf fire curtains for openings that need protection without losing the design. See fire curtains.
Decorating for Victoria and Westminster refurbishments and fit-outs, including hotel and co-working spaces. See painting and decorating.
On-site spraying, ceiling spraying and curtain wall spraying carried out where the work is, to the contractor's specification.
Feature joinery and metalwork finished on site. See joinery and MDF spraying and architectural metalwork spraying.
Out-of-hours working, planned with your programme, as at Senator House.
Request a quoteWhere we are different, and why it matters on a live Victoria programme.
Fire protection and decorating coordinated by one team, so the finish goes on after the protection, not around it.
Proven at Senator House, where we worked out of hours in an occupied building.
An O&M pack with DFT records, QA documentation, installation and application records, photographs and batch and date evidence, in line with Regulation 38.
ISO 9001, ISO 14001, CHAS, SafeContractor and Constructionline. See accreditations and health and safety.
Selected Victoria and Westminster work. Browse everything on our projects page.





Westminster publishes clear guidance on out-of-hours working approval.
At the time of writing, noisy works run weekdays 8am to 6pm and Saturday 8am to 1pm, with Section 61 consent needed outside those hours and a new application at least 28 days ahead. Always check the current position with the council. On the fire side, intumescent and fire stopping work should follow the industry guidance in the ASFP's Yellow Book, and our handover pack gives your team the evidence to show the work was done to the fire strategy.
Send us your fire strategy, drawings and programme and we will confirm availability.
Send us your programmeWe buy the coating, manage the package and arrange the application through specialist labour. At Senator House that meant Jotun intumescent to columns, 90 minutes, out of hours. See intumescent coatings.
Yes. We did at Senator House, and we plan out-of-hours working with your programme.
Ratings of 30, 60 and 120 minutes are typical, and the rating is set by the project's fire strategy. Our fire protection page explains more.
An O&M pack with DFT records, QA documentation, installation and application records, photographs and batch and date evidence.
At the time of writing, weekdays 8am to 6pm and Saturday 8am to 1pm, with Section 61 consent outside those hours. Check Westminster's site for current rules.
Yes. See painting and decorating, ceiling spraying and on-site spraying.
Send us your drawings, fire strategy and programme. We will confirm availability and talk through delivery.
City of LondonDecorating, spraying and fire protection
West EndSpraying and decorating contractor
Southwark and South BankCommercial decorators
Outside LondonSpraying and decoratingLast updated: November 2026