The project
The building had been fully stripped and was ready for a CAT A fit out. Our client needed the internal curtain wall framing and metal panels sprayed to match the existing finish, along with the full CAT A decoration package.
Why they chose Vivid
The client is a long standing customer, and we have completed many successful projects together.
The challenge
Site logistics were the main challenge. To work around the rest of the programme, we carried out all of the spraying in the evenings and at weekends.
What we delivered
- Spraying the perimeter façade window framing and metal panels in Unova Aqua Grip, 10% gloss, to match the existing finish
- Spraying the bottom track to the central atrium glazing
- Decorations to walls, ceilings and woodwork
- One coat of Bradite floor paint
The result
The project was completed on programme, and the client has since awarded us further work.