The project
Senator House is a four storey building in Victoria, London. When we arrived, it had been stripped back to bare shell and all of the steels had been blasted, ready for coating. Our client needed a 90 minute fire rating applied to every existing and new steel across the basement, ground, first and second floors.
Why they chose Vivid
Our client has worked with us for many years, and brought us in to deliver the full passive fire protection package.
The challenge
The building still had tenants in place, so the works had to be planned around them. We carried out all of the spraying out of hours, and had windows removed so we could install local exhaust ventilation while we sprayed.
What we delivered
- Intumescent coating to the columns on the basement, ground, first and second floors, achieving 90 minutes fire protection, using a Jotun intumescent system with a Jotun sealer topcoat
- Spray application to the soffit using Sherwin-Williams and Jotun systems
The result
The full intumescent package was certified throughout the project, giving our client documented 90 minute fire protection on every steel we coated.